Differences
This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision | ||
bpod [2022/02/08 16:17] admin |
bpod [2022/02/08 16:30] (current) admin |
||
---|---|---|---|
Line 9: | Line 9: | ||
A viable solution is to create the culture of using a board where with columns and swim lines we place the orders that are arriving, people take the POs orderly and assign them or a supervisor assigns them, then these people indicate that they stage or procedure is ready by moving the PO Card in leankboard to the next column that corresponds to the next process and so on until the delivery stage. | A viable solution is to create the culture of using a board where with columns and swim lines we place the orders that are arriving, people take the POs orderly and assign them or a supervisor assigns them, then these people indicate that they stage or procedure is ready by moving the PO Card in leankboard to the next column that corresponds to the next process and so on until the delivery stage. | ||
+ | |||
+ | Due to the agile and Kanboard nature and transparency, | ||
Look at the BPOD template example to better understand the use case. | Look at the BPOD template example to better understand the use case. | ||
- | Optionally teams can set up a Kandroid in their mobile devices to operate the dashboard anywhere, anytime. | + | |
+ | {{ : | ||
+ | |||
+ | |||
+ | **Optionally teams can set up a Kandroid in their mobile devices to operate the dashboard anywhere, anytime.** |